LLY PACK(foshan) Co.,Ltd.

LLY PACK(foshan) Co.,Ltd.

Christina@lycorrugated.com

0086-13763260555

LLY PACK(foshan) Co.,Ltd.
HomeNewsInstallation Process for Carton Divider Insertion Machine

Installation Process for Carton Divider Insertion Machine

2024-08-22
Main-04 partition assembly machine

1. Preparation

  • Inspect the Machine: Before installation, thoroughly inspect the carton divider insertion machine to ensure all parts, accessories, and tools are complete and undamaged.
  • Read the Manual: Carefully read the user manual or installation guide to understand the machine's structure, functions, installation requirements, and precautions.
  • Prepare Tools and Materials: Gather necessary tools and materials such as cnc cutting machine blade,screwdrivers, wrenches, screws, nuts, and tapes based on the installation requirements.
  • Select the Installation Location: Choose a flat, stable, and well-ventilated area Folder Gluer for installation, ensuring sufficient space for operation and maintenance.

2. Installation Procedure

  • Secure the Base: Place the base of the carton divider insertion machine at the selected location and firmly fix it to the ground using screws or other fastening devices.
  • Assemble the Main Structure: Follow the steps outlined in the manual to assemble the machine's main structure, including the transmission device, guide rails, robotic arm, and other components. Ensure tight and accurate connections between parts to prevent looseness or misalignment.
  • Connect the Control System: Link the machine's control system to the main structure, including power cables and signal lines. Arrange the wiring neatly, avoiding crossovers, tangles, or exposed wires to ensure safety and reliability.
  • Adjust Parameters: Adjust the folder gluer machine's parameters according to production needs and product specifications, such as the robotic arm's movement path, gripping force, and divider insertion position. Precision is crucial to ensure accurate and efficient divider insertion.
  • Test Run: After installation, conduct a test run to check the machine's stability and performance. Observe the machine's operation closely, promptly identifying and resolving any issues that arise.

3. Precautions

  • Safety First: Prioritize safety throughout the installation process, adhering to safety operating procedures to protect personnel and equipment.
  • Accurate Measurements: Take precise measurements and positioning during installation to ensure accurate relative positions and angles between parts.
  • Maintenance and Inspection: Regularly maintain and inspect the machine after installation to prolong its lifespan and maintain optimal working conditions.
  • partition assembly machine

Previous: Driven by innovative technology, high-efficiency corrugated cardboard production lines lead the new trend in the industry

Next: What is double facer belt?

HomeNewsInstallation Process for Carton Divider Insertion Machine
Related Products List

Home

Product

Whatsapp

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send